{"id":39303,"date":"2025-11-14T23:07:23","date_gmt":"2025-11-14T23:07:23","guid":{"rendered":"https:\/\/lagacetadealmeria.com\/?p=39303"},"modified":"2025-11-15T23:12:40","modified_gmt":"2025-11-15T23:12:40","slug":"tres-empresas-optan-a-construir-el-nuevo-complejo-de-deportes-de-playa-arena-center-en-el-toyo","status":"publish","type":"post","link":"https:\/\/lagacetadealmeria.com\/?p=39303","title":{"rendered":"Tres empresas optan a construir el nuevo complejo de deportes de playa \u2018Arena Center\u2019 en El Toyo"},"content":{"rendered":"\n<p><strong>Cerrado el plazo de licitaci\u00f3n, la Mesa de Contrataci\u00f3n analizar\u00e1 ahora las propuestas presentadas para ejecutar este proyecto, financiado con fondos europeos y valorado en m\u00e1s de un mill\u00f3n de euros<\/strong><\/p>\n\n\n\n<p><strong>El Arena Center permitir\u00e1 la celebraci\u00f3n de competiciones de <\/strong><a><strong>rugby-playa, f\u00fatbol-playa, voley-playa, balonmano-playa y\/o tenis<\/strong><\/a><strong> conviertiendo este espacio en<\/strong><strong> un referente en la pr\u00e1ctica deportiva al aire libre<\/strong><\/p>\n\n\n\n<p>El Ayuntamiento de Almer\u00eda ha cerrado el plazo de presentaci\u00f3n de ofertas para la ejecuci\u00f3n de las obras del nuevo complejo deportivo \u2018Arena Center\u2019, especializado en deportes de playa y ubicado en El Toyo. Un total de <strong>tres empresas -\u2019<\/strong>GrupoCopsa\u2019, \u2018Martizos Servicios S.L.\u2019 y \u2018Pinus S.A.\u2019- han formalizado su candidatura para llevar a cabo este ambicioso proyecto, que cuenta con un <strong>presupuesto de licitaci\u00f3n de 1.001.694,83 euros<\/strong> y un <strong>plazo de ejecuci\u00f3n de seis meses<\/strong>.<\/p>\n\n\n\n<p>A partir de ahora, ser\u00e1 la <strong>Mesa de Contrataci\u00f3n<\/strong> la encargada de evaluar las propuestas recibidas, tanto desde el punto de vista t\u00e9cnico como econ\u00f3mico, con el objetivo de adjudicar las obras lo antes posible y cumplir con el calendario previsto: que las instalaciones est\u00e9n operativas para el pr\u00f3ximo verano.<\/p>\n\n\n\n<p>El \u2018Arena Center\u2019 se construir\u00e1 junto al Palacio de Congresos \u2018Cabo de Gata-Ciudad de Almer\u00eda\u2019, en un enclave estrat\u00e9gico dentro de la urbanizaci\u00f3n de El Toyo. El proyecto forma parte del <strong>Plan de Sostenibilidad Tur\u00edstica en Destino<\/strong>, financiado con <strong>fondos europeos Next Generation<\/strong>, y representa una apuesta decidida del Ayuntamiento por el deporte, la sostenibilidad, la transformaci\u00f3n urbana y el turismo.<\/p>\n\n\n\n<p>La nueva instalaci\u00f3n contar\u00e1 con <strong>dos fosos de arena de 3.404 m\u00b2 y 1.702 m\u00b2<\/strong>, dise\u00f1ados para la pr\u00e1ctica de disciplinas como rugby-playa, f\u00fatbol-playa, voley-playa, balonmano-playa y tenis-playa. Adem\u00e1s, incluir\u00e1 <strong>vestuarios, gimnasio, zona de fitness al aire libre, gradas m\u00f3viles, un quiosco concesionado y 62 plazas de aparcamiento<\/strong>.<\/p>\n\n\n\n<p>El concejal de Ciudad Activa, Movilidad Urbana y Deportes, Antonio Jes\u00fas Casimiro, ha mostrado su \u201csatisfacci\u00f3n\u201d por la concurrencia que finalmente se ha dado en el procedimiento de licitaci\u00f3n para esta actuaci\u00f3n, un proyecto que \u201cresponde a los compromisos adquiridos en nuestro programa electoral y que refuerza la identidad costera y activa de la ciudad, posicion\u00e1ndola como destino internacional de turismo deportivo azul\u201d.<\/p>\n\n\n\n<p>En esta l\u00ednea, ha destacado como El Toyo, ahora con estas instalaciones, se consolidar\u00e1 \u201ctambi\u00e9n como un espacio privilegiado para la pr\u00e1ctica deportiva al aire libre, con infraestructuras modernas, accesibles y pensadas para todos los p\u00fablicos\u201d, recordando que el objetivo es que las obras est\u00e9n finalizadas para el verano de 2026.<\/p>\n\n\n\n<p>El proyecto, redactado por el arquitecto Salvador Cruz Enciso y presentado por la alcaldesa de Almer\u00eda, Mar\u00eda del Mar V\u00e1zquez, el pasado mes de octubre, dise\u00f1a una infraestructura \u201cpolivalente\u201d para albergar todo tipo de deportes playa y preparada para eventos y competiciones de nivel, nacional e internacional.<\/p>\n\n\n\n<p>Otro aspecto destacado de esta instalaci\u00f3n ser\u00e1 la posibilidad de instalar grader\u00edo con ocasi\u00f3n de la celebraci\u00f3n de eventos que puedan acogerse en la misma, todo ello completado con recorridos diferenciados tanto para la presencia de p\u00fablico como para los participantes de competiciones.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"700\" height=\"467\" data-id=\"39305\" src=\"https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14.jpg\" alt=\"\" class=\"wp-image-39305\" srcset=\"https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14.jpg 700w, https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14-300x200.jpg 300w, https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14-150x100.jpg 150w, https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14-330x220.jpg 330w, https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14-420x280.jpg 420w, https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14-510x340.jpg 510w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"700\" height=\"445\" data-id=\"39306\" src=\"https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Render-Arena-Center-El-Toyo.-.jpg\" alt=\"\" class=\"wp-image-39306\" srcset=\"https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Render-Arena-Center-El-Toyo.-.jpg 700w, https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Render-Arena-Center-El-Toyo.--300x191.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/figure>\n<\/figure>\n\n\n\n<p>La actuaci\u00f3n prevista incluye adem\u00e1s la mejora del entorno a trav\u00e9s de una intervenci\u00f3n de restauraci\u00f3n ambiental y la dotaci\u00f3n de m\u00e1s de plazas de aparcamiento a la entrada del complejo.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cerrado el plazo de licitaci\u00f3n, la Mesa de Contrataci\u00f3n analizar\u00e1 ahora las propuestas presentadas para&#8230;<\/p>\n","protected":false},"author":12,"featured_media":39305,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[22],"tags":[],"class_list":["post-39303","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-almeria"],"jetpack_featured_media_url":"https:\/\/lagacetadealmeria.com\/wp-content\/uploads\/2025\/11\/Presentacion-Arena-Center-El-Toyo-14.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=\/wp\/v2\/posts\/39303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=39303"}],"version-history":[{"count":1,"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=\/wp\/v2\/posts\/39303\/revisions"}],"predecessor-version":[{"id":39307,"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=\/wp\/v2\/posts\/39303\/revisions\/39307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=\/wp\/v2\/media\/39305"}],"wp:attachment":[{"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=39303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=39303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lagacetadealmeria.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=39303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}